The new water reservoir on our plantation was filled up for the first time. This is a big milestone for our project as water is the main obstacle for a successful plantation in Niger. Trees such as the Acacia senegal and the Baobab don’t really need water during the dry season, however if they do have access to water their growth is exponential. Regarding the Moringa, water greatly increases the survival rate while also allowing for the harvesting of the highly nutritious leaves every few weeks. During the rainy season from June to September there is of course no shortage of water and even into November water can be easily accessed in some spots; however the rest of the year water was transported for several kilometers to our plantation. Of course this costs a lot of money and time as the technicians on the field always have to wait for the water since the cisterns only holds 3 cubic meters of water!
The water reservoir is therefore great news and it’s the first step of our 37 000 Euros investment in water infrastructure. In the coming weeks a well will be drilled to tap the ground water at around 100 meters below the surface. The water will be brought to the surface by an electric pump, which in turn is powered by a new solar panel. The water reservoir, located upstream the #Moringa_oleifera field has been built above ground level in order to deliver water thanks to gravity (no motor pump needed). It is important to note that in the Sahara and the Sahel there are large aquifers however, as is the case in Dosso, the water can only be tapped in great depths and therefore the local population has no means of accessing it. The well we are working on will therefore also benefit the local agriculture.
This 16 m³ water reservoir is the first among many as the plantation will keep on expanding. Maybe we can even use it as the “employee swimming-pool” when the temperatures rise to 45ºC in April and May…let see!
A few trees will be planted around the reservoir in order to limit
water evaporation due to high temperatures.